Answers are grounded in this paper and cite their sources.
The costs of superconducting magnet strands are compared by calculating a ‘production scaling factor’ P that relates purchase data to the cost of raw materials. Using a consistent method, we normalize for different conductor geometries and strand diameters to arrive at cost indices in $ kg −1 , $ m −1 , and $ kA −1 m −1 . Analyses of Nb47Ti conductors taken from the past 25 years of high-field magnet projects reveal that the price of raw materials and, to a lesser extent, finished strands, have tracked the price of niobium pentoxide. Performance gains during the 1980s produced $ kA −1 m −1 indices that fell with time ahead of strand cost in $ m −1 , a situation that may reflect the present status of Nb 3 Sn magnet conductors. Analyses of present materials show that P decreases systematically with billet mass. While production strands in 200–500 kg billets have costs times the cost of raw materials, the 20–50 kg billet size for internal-tin Nb 3 Sn composites drives P up to 8–10. Thus, in contrast to LHC-type Nb47Ti strands that cost $150 kg −1 , $0.60 m −1 , and $1.00 kA −1 m −1 at 5 T, 4.2 K, Nb 3 Sn strands required for the next generation of accelerator magnets are $1000 kg −1 , $4.00 m −1 , and >$5.75 kA −1 m −1 at 12 T, 4.2 K (where J c is comparable to that for Nb47Ti at 5 T, 4.2 K). This high cost might be reduced by a factor of if a large-scale internal-tin or powder-in-tube Nb 3 Sn process can be found. Replacing expensive components with functionally equivalent but cheaper materials can produce 20% changes in $ kg −1 and $ m −1 , but this might come at a performance penalty and no net savings in $ kA −1 m −1 . Removing stabilizer from the strand cross-section and replacing it elsewhere in the cable can reduce the cost for a given length of cable significantly, but only if the processing cost for the strand remains unchanged after reduction of the stabilizer area. Emerging powder-in-tube composites show promise: Nb 3 Sn strands could reach $6 kA −1 m −1 at 12 T, 4.2 K, while Bi-2212 strands could fall below $10 m −1 . MgB 2 superconducting strands could have very low raw materials cost at $0.20 m −1 , which translates to $1.00 m −1 for finished strands and at 2 T, 4.2 K based on published data.
No takes yet. Share an insight, caveat, or question.
Cooley et al. (2005) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: