Answers are grounded in this paper and cite their sources.
Assembly cell lines (ACLs), originating from the Toyota Production System and widely adopted in electronics manufacturing, divide a conveyor line into multiple assembly cells (ACs). Each AC stores the required parts, enabling multi-skilled workers to complete the entire product assembly at their own pace. With the advancement of Industry 4.0 technologies, smart ACLs increasingly integrate human and machine capabilities and support flexible reconfiguration to meet personalised production demands. However, variability in manual operations and manufacturing uncertainties poses significant challenges. These factors not only affect the performance of ACLs but also hinder the synchronisation between production activities and material supply (intralogistics), leading to waiting times, downtime, and reduced productivity. This challenge is referred to as the production-intralogistics synchronisation (PiLS) problem. To address this issue, this paper proposes a real-time, data-driven PiLS mechanism based on the Graduated Intelligent Manufacturing System (GiMS) framework. A human-cyber-physical architecture and a multi-objective optimisation model are developed, and an improved multi-objective simulated annealing (IMOSA) algorithm is introduced. Case studies demonstrate superior PiLS performance compared with traditional scheduling approaches, offering an effective solution for dynamic manufacturing environments with human involvement.
No takes yet. Share an insight, caveat, or question.
Ling et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: