Answers are grounded in this paper and cite their sources.
Rail mounted gantry crane (RMGC) scheduling is important in reducing makespan of handling operation and improving container handling efficiency. In this paper, we present an RMGC scheduling optimization model, whose objective is to determine an optimization handling sequence in order to minimize RMGC idle load time in handling tasks. An ant colony optimization is proposed to obtain near optimal solutions. Computational experiments on a specific railway container terminal are conducted to illustrate the proposed model and solution algorithm. The results show that the proposed method is effective in reducing the idle load time of RMGC.
No takes yet. Share an insight, caveat, or question.
Wang et al. (2014) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: