Answers are grounded in this paper and cite their sources.
Settlement, rather than bearing capacity (stability) criteria, usually exert the design control when the least width of a foundation over sand exceeds 3 ft to 4 ft. Engineers use various procedures for calculating or estimating settlement over sand. Computations based on the results of laboratory work, such as oedemeter and stress-path triaxial testing, involve trained personnel, considerable time and expense, and first require undisturbed sampling.
No takes yet. Share an insight, caveat, or question.
A 1970 study studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: