Answers are grounded in this paper and cite their sources.
Kanet addressed the problem of scheduling n jobs on one machine so as to minimize the sum of absolute lateness under a restrictive assumption on their common due date. This article extends the results to the problem of scheduling n jobs on m parallel identical processors in order to minimize the sum of absolute lateness. Also, a heuristic algorithm for a more general version with no restriction on the common due date, for the problem of n‐job single‐machine scheduling is presented and its performance is reported.
No takes yet. Share an insight, caveat, or question.
Sundararaghavan et al. (1984) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: