Answers are grounded in this paper and cite their sources.
Fleet electrification across the Global South is concentrating new load on the grids least able to absorb it; in Sub-Saharan African cities, boda-boda taxis, last-mile delivery motorcycles, and bus depots are being electrified on networks with little spare capacity. Planning the charging infrastructure these fleets need – peak grid load, charger counts, and battery inventory – has so far required a separate, slow, bespoke simulator for each fleet type, putting cross-fleet comparison beyond the reach of the planners and utilities who must make the decisions. We consolidate three such pipelines (boda-boda, delivery motorcycle, and bus depot) into a single open-source, configuration-driven tool that produces minute-resolution grid-load curves and resource counts for any fleet from a CSV of trip or arrival-event records, and we validate it against the published outputs of all three source pipelines across 28 scenarios (mean-day grid-load curves reproduced at Pearson r ≥ 0.95 throughout, r ≥ 0.99 on 19 of 28; daily energy within ± 5 % on 23; 11–47 × faster per scenario). Running the three fleets through one pipeline exposes planning regularities no single study could: a peak demand that scales with fleet size but whose per-vehicle level is set by the charging approach (approximately 0.15 to 0.41 kW per motorcycle, around 18 kW per bus at 30 kW), a worst-case-to-mean-day feeder-load ratio of roughly 1.6 to 2.6 for the motorcycle fleets, and a flatter, more solar-compatible diurnal profile under battery swapping than under home charging. These give resource-constrained planners first-order reference points and identify charging architecture as a lever on both feeder headroom and solar-pairing potential.
No takes yet. Share an insight, caveat, or question.
Stratford et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: