Answers are grounded in this paper and cite their sources.
In this paper, we consider the replacement of a unit that is subject to a dominant failure mode. The unit is usually replaced by an age-based replacement policy, either when a preset age limit has been reached, or when failure occurs before this limit. However, the unit can also be replaced when it encounters a random production wait and its age has reached a certain threshold. Using such an opportunity for replacement can help to minimize system downtime. We formulate this joint age-based replacement limit and threshold optimization problem with the objective of minimizing the expected cost per unit time in the long run. A real-data example is presented to illustrate the applicability and effectiveness of our model.
No takes yet. Share an insight, caveat, or question.
Li et al. (2015) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: