The proposed approach combines program evaluation review technique (PERT) and critical path method (CPM) into a single-project scheduling problem. Given that activity time and cost are uncertain, a robust design for project scheduling using the response surface methodology (RSM) is presented in the proposed research. The controllable variables are the mean and tolerance of activity time, which are both cost related. In order to simulate an actual application, activity times, activity tolerances, activity time costs and activity tolerance costs are all randomly created from known probabilistic distributions. The probabilistic values of completion time within a promised date and of total cost under a given budget are also considered as response values for statistical optimisation. As is already known, the solutions found using RSM are solutions that are optimised for a single objective only. In the case of multiple objectives, actions for further optimisation are necessitated within a limited project budget, restricted completion time, allowable total cost probability, and acceptable completion time probability. Hence, after gathering response functions using RSM, an optimisation technique, mathematical programming, is used to formulate the problem in an integral fashion and solve multiple objectives under various constraints.
No takes yet. Share an insight, caveat, or question.
Chiang et al. (2015) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: