Answers are grounded in this paper and cite their sources.
Data from geographic information systems (GIS) are important for developing input datasets for watershedmodels. However, the process used to translate GIS data into modelinput data can introduce errors. Although GIS data areroutinely checked to assure their mapping accuracy, it is far less likely that the derived modelinput data are verified. Theobjective of this project was to assess GIS interfacegenerated data for the AGNPS watershed model by comparison tobaseline data from a manually conducted field survey for the Horseshoe Creek watershed in Kansas. Multiple descriptors wereused to assess agreement between datasets. Very good agreement was found for soil parameters (soil texture and erodibility),moderate agreement for landuse parameters (crop and management practice factors), and poor agreement for topographicparameters (slope and slope length). The absence of GIS data layers pertaining to management practices, such as contouringand terracing, reduced the agreement in landuse terms. Poor estimation of slope by the GIS interface model for larger cellsizes resulted in the poor agreement in topographic values. Issues related to appropriate cell sizes, generation oflandmanagement practice GIS coverages, accuracy of GIS coverages, and accuracy of interface algorithms must beaddressed by watershed modelers using GIS data.
No takes yet. Share an insight, caveat, or question.
Mankin et al. (2002) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: