This paper presents a computerized system, called PROMAX, for integrating project and process level planning and management. The system integrates the project management level capabilities of the PROJECT I system with those of the CYCLONE process level modeling system. Simulation is used at the process or technological level to determine the durations of project level activities. Variations in resource allocation and cost and their impact on schedule and cost at project level can be studied using the system.
No takes yet. Share an insight, caveat, or question.
Dabbas et al. (1982) studied this question.