Summary Inspection interval guidelines were developed to reduce the occurrence of costly drillstring fatigue failures. The guidelines are based on a state-of-the-art fracture mechanics model and incorporate reliability data of commercial inspection services using conventional nondestructive testing techniques. On the basis of extensive full-scale testing, the model was found to predict fatigue-crack-growth behavior reliably. By establishing inspection intervals on the basis of fatigue-crack growth, inspection services are systematically and cost-effectively specified to achieve acceptable reliability (or risk). Simple equations and charts are presented in terms of practical drilling parameters to reduce typical downhole fatigue failures.
No takes yet. Share an insight, caveat, or question.
B. A. Dale (1989) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: