This is the authors' abstract. We don't add key points for this paper.
With increased product specialization within the chemical‐processing industries, the ability to obtain production schedules for complex facilities is at a premium. This article discusses ways of quickly obtaining solutions for industrially relevant, large‐scale scheduling problems. A number of time‐based decomposition approaches are presented along with their associated strengths and weaknesses. It is shown that the most promising of the approaches utilizes a reverse rolling window in conjunction with a disaggregation heuristic. In this method, only a small subsection of the horizon is dealt with at a time, thus reducing the combinatorial complexity of the problem. Resource‐ and task‐unit‐based decompositions are also discussed as possible approaches to reduce the problem to manageable proportions. A number of examples are presented throughout to clarify the discussion.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
Bassett et al. (1996) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: