Answers are grounded in this paper and cite their sources.
Existing optimization decision-making approaches for pavement maintenance and rehabilitation (M&R) ignore the construction length of preventive maintenance (PM) projects, and its negative effects are difficult to be transformed into cost. To address this issue, this study proposes a bi-objective decision-making model that incorporates the problem as the second objective into the two-stage bottom-up approach. The proposed model contains selection of performance indicators, Bayesian neural network-based probabilistic deterioration model, evaluation of initial M&R actions on a segment level, and bi-objective decision-making. It is solved by the enumeration method and the non-dominated sorting genetic algorithm II. Finally, the Pareto solutions are obtained. A solution is an M&R plan, where an initial action (treatment type) is selected for a pavement segment. Among the Pareto solutions, the one with the second objective greater than or equal to and closest to the shortest construction length, is the optimal M&R plan. In addition, compared with the model that converts the problem into a constraint, the proposed model recommends a better plan that can achieve higher performance at lower cost, which validates the strength of the proposed model. Decision-makers can adopt the proposed model to optimize pavement M&R plans that consider the construction length of PM projects.
No takes yet. Share an insight, caveat, or question.
Xiao et al. (2023) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: