Answers are grounded in this paper and cite their sources.
It is 18 years since the V 2 control was proposed in 1996. Many publications have shown that the V 2 controlled switching converter exhibits an ultra‐fast load transient response. Recently, it has been reported that the conventional V 2 control is inherently a peak V 2 control, based on which V 2 control can be classified as peak V 2 and valley V 2 controls. However, till now the switching converter with V 2 control is almost a buck converter. This leads to the investigation of whether the V 2 control can be applied to a boost converter.
No takes yet. Share an insight, caveat, or question.
Zhou et al. (2014) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: