Answers are grounded in this paper and cite their sources.
Aggregate planning involves planning the best quantity to be produced during time periods in the medium‐range horizon at the lowest cost. Usually, the production manager seeks a plan that simultaneously optimizes several incommensurable and conflicting objectives, such as total cost, level of inventories, level of customer service, fluctuation in workforce, and utilization level of the physical facility and equipment. The goal programming (GP) model is one of the best known multi‐objective programming models that considers simultaneously several conflicting objectives to select the most satisfactory solution among a set of feasible solutions. In the production planning problem, the goals and the technological parameters are naturally imprecise. Moreover, the existing GP formulations developed in industrial engineering and aggregate production planning do not explicitly incorporate the manager's preferences. The aim of this paper is to develop a GP formulation within an imprecise environment where the concept of satisfaction function will be utilized to explicitly introduce the manager's preferences into the aggregate planning model.
No takes yet. Share an insight, caveat, or question.
Mezghani et al. (2012) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: