Answers are grounded in this paper and cite their sources.
This article discusses a possibilistic aggregate production planning (APP) model for blending problem in a brass factory; the problem computing optimal amounts of raw materials for the total production of several types of brass in a planning period. The model basically has a multi-blend model formulation in which demand quantities, percentages of the ingredient in some raw materials, cost coefficients, minimum and maximum procurement amounts are all imprecise and have triangular possibility distributions. A mathematical model and a solution algorithm are proposed for solving this model. In the proposed model, the Lai and Hwang's fuzzy ranking concept is relaxed by using ‘Either-or’ constraints. An application of the brass casting APP model to a brass factory demonstrates that the proposed model successfully solves the multi-blend problem for brass casting and determines the optimal raw material purchasing policies.
No takes yet. Share an insight, caveat, or question.
Sakallı et al. (2010) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: