A framework to study the strategic adaptation of infrastructures in an operating mining complex, while generating a strategic production schedule accounting for mineral deposit supply (geological) uncertainty, is proposed. Focus is placed on the removal of production facilities that, due to mining complex expansions, generate conflicting areas of interest. The approach extends the simultaneous stochastic optimisation of mining complexes. A study of the removal of a conflicting mill at a copper mining complex demonstrates the proposed approach. Results present 10% NPV increase by optimising the strategic plan of the mining complex. The NPV of the operation increases further by 5% to 9% by optimising the year the conflicting mill is removed.
No takes yet. Share an insight, caveat, or question.
Dimitrakopoulos et al. (2025) studied this question.