Answers are grounded in this paper and cite their sources.
Mines operate in uncertain heterogenous environments, in which the most profitable material must be delineated from lower value-material. Traditionally, single-element cut-off grades provide this delineation and methods for optimising date back to the 1960s. Recent advancements have included geological uncertainty, multiple elements, and production scheduling; however, no method combines all three improvements. Two multi-element cut-off grade definitions are proposed herein, along with a reinforcement learning framework for optimising long-term multi-element cut-off grades under geological uncertainty for an optimal production plan. The method is applied to a gold-copper mining complex, and the performance of both cut-off grade definitions is compared.
No takes yet. Share an insight, caveat, or question.
Cutler et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: