In Texas, many miles of plain jointed concrete pavement (JCP) were constructed without proper load transfer devices such as dowels. After a number of years of service, some JCP sections without dowels showed distresses in the form of faulting at transverse joints. Some of the sections were designed in accordance with the AASHTO 1986 Guide, which required 50–75mm thicker slabs in exchange for not using dowels. This pavement design did not work, with faulting at transverse joints that cause poor ride. Dowel bar retrofit (DBR) was performed on four projects to restore the pavement condition. Overall, DBR restored load transfer efficiency and resulted in improvement of ride quality. Even where the subbase stiffness is 5–10 times less than the minimum value required for proper performance of JCPs, properly installed DBR effectively restored pavement condition with minimum faulting after decades of service. Therefore, it indicated that DBR is able to minimize the faulting even where there is poor base/subgrade support. This is significant in that there are no effective and practical methods to improve subbase conditions in existing concrete pavement, whereas DBR can restore pavement conditions at a reasonable cost. However, not all DBR projects were successful. In one DBR project, faulting in the range of 6.4–9.5mm occurred after less than 2 years of treatment. Forensic investigation revealed voids under the dowel bars, which indicates poor consolidation of the grout material. Efforts are currently underway in TxDOT to improve specifications for grout materials and DBR construction.
No takes yet. Share an insight, caveat, or question.
Chen et al. (2008) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: