The high penetration of renewable energy resources has made it harder to secure a flexible power system. Accordingly, this has become an issue in operating power systems. As a possible solution, pumped hydroelectric energy storage (PHES) has received much attention because of its fast start-up and ramp characteristics. This study proposes a flexibility-based reserve scheduling method for PHES. In this method, the reserve scheduling of PHES was conducted to improve flexibility; the associated risk index was termed the ramping capability shortage expectation (RSE). The peak-load days in 2016 and 2029 were selected to examine the applicability and performance of the proposed method. Results indicate that the proposed method can improve the flexibility by 4.45% for 2016 and 0.9% for 2029, respectively.
No takes yet. Share an insight, caveat, or question.
Mun-Kyeom Kim (2017) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: