In this paper, we address a stochastic variant of the well‐known permutation flowshop scheduling problem, where the processing times of the jobs in the machines are assumed to be random variables. The objective considered is to minimise the expected makespan. This problem is substantially harder than its deterministic counterpart, as—except for a few special cases involving rather restrictive hypotheses—there is no closed formula to obtain the expected makespan of a given solution. Therefore, for most cases, it is necessary to estimate its expected value by sampling and averaging the results across a large number of replications. Furthermore, it has been shown that the number of replications required to obtain a reasonable estimate increases with the variability of the instance. In practice, this imposes extremely high computational costs for evaluating a solution, making it difficult to apply local search methods to instances of realistic size. Our proposal is to embed a machine learning technique (more specifically, gradient boosted trees or GBT) into a GRASP (greedy randomised adaptive search procedure) to compute a probabilistic threshold so it is possible to discard solutions with low probability of improving the actual best solution. The computational experience carried out shows that (1) the GBT is able to provide rather accurate estimates of the expected makespan even with a modest training effort and that its accuracy is not essentially influenced by the variability of the scenario and (2) the proposed procedure is able to produce the same quality of results as using the full sample of each solution, reducing the number of evaluated solutions by roughly 15%.
No takes yet. Share an insight, caveat, or question.
A 2025 study studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: