To successfully execute the construction project, many efforts have been made to apply 3D-based Building Information Modeling (BIM). In practice, however, a data storage and retrieval system has yet to be developed because an extensive database structure is required in time/cost analysis for a particular project. This study is aimed to develop a generic BIM database structure and customize it for an aged-housing remodeling project. Throughout the Vicosoft’s Constructor software, the pre-made BIM database structure has been developed. The case study has shown the efficacy and usability of BIM-based project management practice. The complete set of 378 pre-made recipe types have been defined with 55 methods and 47 resource items. The proposed BIM application process has been proven to be a useful tool for efficient project management by identifying work items and recognizing the relationships among activities. The advantages of using the pre-made BIM database to the time/cost analysis hare twofold: human error reduction and work efficiency. The limitations in and barriers against using the BIM database have also been discussed.
No takes yet. Share an insight, caveat, or question.
Sung et al. (2014) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: