Answers are grounded in this paper and cite their sources.
This paper studies the problem of scheduling machines in the photolithography area of a semiconductor manufacturing facility. The scheduling problem is characterized as an unrelated parallel machine scheduling problem with machine eligibilities, sequence- and machine-dependent setup times, auxiliary resources and transfer times for the auxiliary resources. Each job requires two auxiliary resources: a reticle and a pod. Reticles are handled in pods and a pod contains multiple reticles. Both reticles and pods are used on multiple machines and a transfer time is required if transferred from one machine to another. A novel constraint programming (CP) approach is proposed and is benchmarked against a mixed-integer programming (MIP) method. The results of the study, consisting of a real-world case study at a global semiconductor manufacturer, demonstrate that the CP approach significantly outperforms the MIP method and produces high-quality solutions for multiple real-world instances, although optimality cannot be guaranteed.
No takes yet. Share an insight, caveat, or question.
Deenen et al. (2023) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: