Answers are grounded in this paper and cite their sources.
This paper investigates the stability of the master production schedule (MPS) in a multi-product batch chemical plant, a typical example of manufacturing plants in the process industry. The effects of demand pattern, replanning periodicity, setup costs and unit production cost on the performance of the MPS in a rolling horizon situation are examined. Adopting the hierarchical production planning framework, a two-level mathematical model is developed to conduct the study. A comprehensive simulation work and statistical analyses are reported in this work. The results of the study show that replanning periodicity significantly influences the scheduling instability and the impact of setup cost on scheduling instability is dependent on the demand pattern and the unit production cost. Moreover, the findings indicate that replanning frequency does not affect the total cost of the system if the cost structures are not extreme. Finally, the results show that cost structures affect the batching of orders (converting production quantities into an optimal number of batches to be processed).
No takes yet. Share an insight, caveat, or question.
Omar et al. (2008) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: