Answers are grounded in this paper and cite their sources.
The construction of the superconducting magnets for the LHC machine has required the supply of ~7350 km of superconducting cables. The delivery of cables which is completed at 97% has made use of a large part of the world wide production capacity. Ten contracts have been placed with firms in Europe, Japan, USA. The Nb-Ti and the Nb materials have been contracted by CERN. Before tendering and placing the contracts, a R&D program has combined studies at CERN and orders of finished cables of significant lengths to industry. The report will present the main results of the R&D program, the characteristics of the LHC cables, the encountered difficulties and the obtained successes during the long duration fabrication contracts of the highly sophisticated LHC superconducting cables
No takes yet. Share an insight, caveat, or question.
D. Leroy (2006) studied this question.