Research Article| October 18 2016 A comprehensive review on the challenges of cured-in-place pipe (CIPP) installations Susen Das; Susen Das 1University of Alberta, Natural Resources Engineering Facility, 1-060, 116 Street NW, Edmonton, AB, Canada T6G 2W2 Search for other works by this author on: This Site PubMed Google Scholar Alireza Bayat; Alireza Bayat 2Consortium for Engineered Trenchless Technologies and Department of Civil and Environmental Engineering, Donadeo Innovation Centre for Engineering, 7-243, 9211 116 Street, Edmonton, AB, Canada T6G 1H9 E-mail: abayat@ualberta.ca Search for other works by this author on: This Site PubMed Google Scholar Leon Gay; Leon Gay 3Department of Civil Engineering at the Universidad de Guanajuato, Juarez 77 centro, Guanajuato, Gto. 36020 Mexico Search for other works by this author on: This Site PubMed Google Scholar Mahmoud Salimi; Mahmoud Salimi 4Donadeo Innovation Centre for Engineering, 7-361, 9211 116 Street, Edmonton, AB, Canada T6G 1H9 Search for other works by this author on: This Site PubMed Google Scholar John Matthews John Matthews 5Pure Technologies, 7231 Palmetto Drive, Baton Rouge, LA 70808, USA Search for other works by this author on: This Site PubMed Google Scholar Journal of Water Supply: Research and Technology-Aqua (2016) 65 (8): 583–596. https://doi.org/10.2166/aqua.2016.119 Article history Received: December 07 2015 Accepted: September 01 2016 Views Icon Views Article contents Figures & tables Video Audio Supplementary Data Share Icon Share Facebook Twitter LinkedIn MailTo Tools Icon Tools Cite Icon Cite Permissions Search Site Search Dropdown Menu toolbar search search input Search input auto suggest filter your search All ContentAll JournalsThis Journal Search Advanced Search Citation Susen Das, Alireza Bayat, Leon Gay, Mahmoud Salimi, John Matthews; A comprehensive review on the challenges of cured-in-place pipe (CIPP) installations. Journal of Water Supply: Research and Technology-Aqua 15 December 2016; 65 (8): 583–596. doi: https://doi.org/10.2166/aqua.2016.119 Download citation file: Ris (Zotero) Reference Manager EasyBib Bookends Mendeley Papers EndNote RefWorks BibTex This paper outlines the issues and challenges associated with cured-in-place pipe (CIPP) rehabilitation projects of sewer mains, water mains, and service laterals. Common problems and challenges are first reviewed from the available literature and CIPP installation site visits. These obstacles and risks are classified into five different categories: pipe condition and configuration, pre-installation, challenges during installation, post-installation, and environmental challenges. In addition, this paper discusses relevant measures adopted in the current practices to mitigate these challenges. The main purpose of this paper is to provide a concise but comprehensive summary of all information needed by researchers and engineers to understand the obstacles and challenges that may arise during CIPP rehabilitation work. Meanwhile, much effort is made to identify future research needed to better understand how the current practice deals with such issues and to find better solutions to current challenges. CIPP, issues and challenges, service laterals, sewer main, trenchless, water main © IWA Publishing 2016 You do not currently have access to this content.
No takes yet. Share an insight, caveat, or question.
Das et al. (2016) studied this question.
Synapse has enriched 3 closely related papers on similar clinical questions. Consider them for comparative context: