Summary Liquid loading in low-production gas wells is a common problem faced in many producing regions around the world. The techniques available to remove liquids from the wellbore impose significant capital and operational costs. This study investigates a new method for unloading and restoring continuous production of low-rate (i.e., stripper) gas wells. The performance of a patented vortex-flow-modifier tool was examined using a 125-ft vertical-flow loop of 2-in.-diameter clear PVC pipe. The vortex device was found to alter the basic flow structure in the pipe, resulting in improved liquid flow. The tool was observed to reduce tubing-pressure loss by up to 17% and lower the minimum gas velocity required to lift liquids up the tubing string.
No takes yet. Share an insight, caveat, or question.
Ali et al. (2005) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: