Key result
Implementation of a standardized hand-off tool for ED transfers yielded a 43% completion rate and was associated with an unexpected increase in median turnaround time by 6.62 hours in the first month.
Why the study?
Does a standardized hand-off tool improve throughput times for patients admitted from the emergency department?
Observational (n=30)
No
Does a standardized hand-off tool improve throughput times for patients admitted from the emergency department?
Effect estimate: increase of 6.62 hours
Absolute Event Rate: 32.31% vs 25.69%
Implementation of a standardized hand-off tool in a pilot ED unit had mixed effects on throughput times and patient flow metrics, highlighting the challenges of quality improvement interventions.
Standardized handoff may shorten ED throughput; leaves open generalizability and durability beyond this single-unit pilot.
Purpose of Project: This quality improvement project implemented a standardized handoff tool to evaluate impacts on throughput times, and patient flow through the emergency department.Methodology: In an urban, central New Jersey-located level-one trauma center, a retrospective and prospective chart review of patients admitted from the emergency department to one inpatient pilot unit (4T) during the two month implementation period was conducted. Throughput times pre and post handoff tool implementation were studied and compared.Results: Of the 30 patients who met criteria for the pilot project, 43% (n=13) of hand-off tools were completed and used for patient transfer. The median turnaround time was 25.69 hours for the month prior to implementation and increased by 6.62 hours for the following month and increased by 20.19 hours for the month following that. When considered the previous year’s turnaround time for the same month, January 2021 time decreased by 6.52 hours, February’s time decreased by 17.87 hours and March’s time increased by 17.87 hours. For two months prior to implementation the AMA numbers were 44 and 38, and decreased to 35 for the first month of implementation then increased again back to 50 patients. LWBT values were lower pre-implementation. LWOB numbers decreased in the first month of implementation and then increased again to 41 patients. Implications for Practice: Cost-saving measures for the healthcare system, safer patient care, improved quality of patient data being shared, improved throughput times, increased inter- and intra-professional collaboration and communication, decreased adverse outcomes reaching the patients.
No takes yet. Share an insight, caveat, or question.
Ashley F. Krasucki (2021) conducted an observational in Emergency department admission to inpatient unit (n=30). Standardized hand-off tool vs. Pre-implementation (no standardized tool) was evaluated on Median turnaround time (increase of 6.62 hours). Implementation of a standardized hand-off tool for ED transfers yielded a 43% completion rate and was associated with an unexpected increase in median turnaround time by 6.62 hours in the first month.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: