Answers are grounded in this paper and cite their sources.
In order to reveal the coupling mechanism of a suspended permanent magnet levitation (SPML) train-track-bridge system, this paper adopts multi-body dynamics and finite element methods to establish a coupled model of the SPML train-track-bridge system. For the track–bridge coupling method, two mechanical modeling approaches have been proposed: the nodal coupling and force element connection models. Through a comparative analysis between the on-site experimental results and simulation data, the reliability and validity of the proposed coupled model were verified. The research results indicate that the data obtained from the two modeling methods are consistent. Compared with the force element connection method, the nodal coupling method simplified the modeling process, enhanced computational efficiency and reduced computing time. For the optimization of the bogie structure, the top-mounted magnetic rail significantly reduced the vibration responses of the train and track girder, lowering the lateral vibration frequency in the range of 20-30 Hz. Additionally, the top-mounted magnetic rail optimized the lateral force between the guide wheel and the track girder, effectively reducing the roll motion of the bogie and enhancing the train’s stability.
No takes yet. Share an insight, caveat, or question.
Gao et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: