Answers are grounded in this paper and cite their sources.
To effectively mitigate stochastic disturbances during production and ensure the on‐time delivery of orders, manufacturing systems must demonstrate resilience by rapidly generating revised production schemes within critical time windows. Although traditional scheduling methods facilitate system recovery, existing centralised approaches often suffer from computational paralysis and decision failure due to excessive rescheduling frequencies. Conversely, distributed multi‐agent methods are frequently constrained by limited local observability, leading to suboptimal convergence. To address these challenges, this study proposes a multi‐agent deep reinforcement learning (MADRL) scheduling method based on dynamic information entropy‐driven QMIX (DE‐QMIX). First, the flexible job‐shop scheduling problem is formulated as a partially observable markov decision process (POMDP), empowering individual machine agents to respond to disturbances based on localised perceptions. Second, a self‐attention mechanism is embedded within the agent architecture to optimise feature weight allocation, effectively suppressing policy degradation in high‐dimensional observation spaces. Finally, the cascading effects of disturbance events are inferred using a shop‐floor job network adjacency matrix. By integrating node‐level information entropy to quantify global state fluctuations, the proposed method significantly enhances the operational robustness of the system under multi‐disturbance scenarios.
No takes yet. Share an insight, caveat, or question.
Zhang et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: