Answers are grounded in this paper and cite their sources.
Given deterministic and probabilistic weather forecasts, an end-user can make decisions about when to start offshore operations that require several hours of low significant wave height (Hs). In this exercise the cost-loss model used is based on the performance of past predictions. Eleven years of observations collocated with both types of forecast, probabilistic and deterministic, are input into the model. The data are from the Ekofisk oil field located in the North Sea. The forecasts are from the European Centre for Medium Range Weather Forecasts (ECMWF) and the observations come from buoys. When the probabilistic forecast performs better than the deterministic forecast a probability threshold is recommended for when to start such offshore operations. The results show that the probabilistic forecast offers benefits over the deterministic forecast for a range of cases where large losses are expected.
No takes yet. Share an insight, caveat, or question.
Carrasco et al. (2013) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: