A bstract Microgravimetric surveys for verifying bedrock soundness at the foundation of a nuclear power plant and for delineating a zone of small cavities and tracing grout emplacement at the foundation of a large cooling tower are described and used to illustrate an analysis of the method. It is pointed out that the difference between the usual large scale gravity surveys and microgravimetric surveys for engineering applications involves significantly more than a mere scaling down of grid spacings and precision tolerances. In addition to the smaller scale, the special physical environments for such microgravimetric surveys as well as strict timing and economy considerations and the demand for conclusive answers to specific questions require careful revisions of field procedures as well as data reduction and interpretation. Where properly applied, microgravimetric surveys—usually in conjunction with selective drilling—yield reliable subsurface information with a high resolution that is still limited by the gravimeter noise. Costly extensive drilling can thus be avoided. The method offers special advantages over other subsurface exploration methods in a wide variety of applications.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
A. A. ARZI (1975) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: