Answers are grounded in this paper and cite their sources.
In the industrial transformation of animal feed for chickens, downtime analysis is a crucial part of the plant's operations. Unfortunately, the literature on downtime analysis has a serious shortcoming; it fails to link downtime with Taguchi method’s optimization and ranking. To correct this deficiency, this paper proposes a new method that couples the Taguchi scheme with the weighted sum method (WSM), weighted product method (WPM) and weighted aggregated sum product assessment (WASPAS) method. A new model was developed to contain downtime factors, levels, orthogonal matrix, signal-to-noise proportions, normalisation indices, criteria weights and preference scores. The results of the Taguchi-WSM, Taguchi-WPM and Taguchi-WASPAS show that workstation 2 has the highest rankings of 0.8446, 8.9090 and 4.8770 for the Taguchi-WSM, Taguchi-WPM and Taguchi-WASPAS, respectively. Also, the lowest rankings of 0.1553, 6.7990 and 3.4800 were recorded for workstation 1 using the Taguchi-WSM, Taguchi-WPM and Taguchi-WASPAS methods, respectively. However, from literature reports, WASPAS has been associated with the best results compared to WSM and WPM. Hence, from the various results of prioritizing workstations 1 and 2, the results of the Taguchi-WASPAS method are recommended. This is the first time the downtime problem for animal feed processing equipment will be approached by a joint optimization and ranking with the Taguchi scheme, WSM, WPM and WASPAS multicriteria methods.
No takes yet. Share an insight, caveat, or question.
Abiola et al. (2022) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: