Answers are grounded in this paper and cite their sources.
A method is presented for determining an optimum sequencing inspection plan for a group of inspectors operating at different skill and cost levels. Production and inspection costs for both accepted and rejected items are considered, and dependencies among successive inspections are permitted. A branch-and-bound technique is used to determine the optimum plan. Results are demonstrated by a numerical example.
No takes yet. Share an insight, caveat, or question.
Raz et al. (1983) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: