A design procedure of stabilizing cable is proposed using buffeting analysis to stabilize the seesaw-like motion of the free cantilevered structure of a cable-stayed bridge during its construction. The bridge examined is a composite cable-stayed bridge having a main span length of 500 m. Based on the buffeting analysis, the stress in bare structure exceeded the allowable limit and a set of stabilizing cable was planned to mitigate the responses. The most efficient positions of the hold-down stabilizing cables were numerically investigated by means of an FE-based buffeting analysis and the required dimensions and pretension of the stabilizing cables were also calculated. The proposed stabilizing measure would be expected to secure the aerodynamic safety of a cantilevered structure under construction with considerable mitigation of buffeting responses.
No takes yet. Share an insight, caveat, or question.
Choi et al. (2008) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: