Conceptual pre-estimation of road tunnel costs is a vital yet challenging process during feasibility studies due to the prevailing underground uncertainties and risks. Most existing cost estimation approaches are deterministic, probabilistic methods are limited to a single cost examination. This paper introduces a probabilistic model for pre-estimating road tunnels life-cycle costs. It aims to capture their inherent uncertainty holistically, thus enabling more reliable decision-making at a project’s early stages. The proposed model is developed in three steps: multiple regression analysis, fitting distribution, and Monte-Carlo simulation. The first step unveils the correlations between independent and dependent variables, while the other two steps return the probabilistic descriptions of cost drivers and life-cycle costs. Civil engineering, electromechanical works costs, energy consumption, and operation & maintenance costs are determined as the model’s output variables. A real-world database of 32 dual-bore road tunnels with a total length of 55 km is used to develop probability distributions within reasonable confidence intervals and a sensitivity analysis was performed utilizing tornado charts. The results can assist public authorities and managers in estimating the probability of a specific life-cycle cost and making appropriate decisions in accordance with their risk tolerance.
No takes yet. Share an insight, caveat, or question.
Petroutsatou et al. (2023) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: