In a project-based ETO (Engineering-To-Order) industry, design, purchasing, production and quality processes are closely integrated to meet a delivery schedule, cost limitation and quality specification. When an engineering change occurs in a project execution stage, miscommunication of design change may generate a significant cost and delay. This paper suggests a model to capture a design change and share activities for processing change done by each stakeholder. The framework also captures ECR (Engineering Change Request), ECO (Engineering Change Order) and a relationship among them with a result of processes. The data could be used for analysing defects of each process, improving a design quality, and a plan for cost reduction. For capturing, sharing and monitoring every change of drawing element and BOM (Bill of Materials), the model extracts a drawing and BOM from a product structure of a 3D CAD (Computer-Aided Design) system. Extracted data are sent to PLM (Product Life-Cycle Management)/ERP (Enterprise Resource Planning) system for planning, purchasing, manufacturing and quality control processes.
No takes yet. Share an insight, caveat, or question.
Han et al. (2014) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: