Answers are grounded in this paper and cite their sources.
The proposed site of the wastewater treatment pond is located in a terrain inside the Polytechnic Campus and the New Staff Quarters where the storm-runoff flow has on effect. The site possesses good soil characteristics which include a particle size distribution of sandy soil with little fine particles of gravel, a specific gravity of 2.77 and a soil moisture content of 7.26% indicating a high degree of permeability. The output of geotechnical analysis indicated that the proposed site has soil particle density (ρs) and dry bulk density (ρb) of 1.76 g/cm3 and 1.64g/cm3 respectively. Void ratio (e), porosity (ȵ) values of 0.87 and 0.46 (46%) were determined. The atterbergs limits of 19.0%, 14.96% and 19.6% for shrinkage limit (SL), plastic limit (PL) and liquid limit (LL) were estimated with a computed plastic index (PI) of 3.04. The soil profile formation is highly sandy with a good lateritic layer to support the pond foundation. The proposed pond design volume (V) is 898.5 m3 and land areas of 718.8 m2 were estimated for the project.
No takes yet. Share an insight, caveat, or question.
N et al. (2020) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: