Answers are grounded in this paper and cite their sources.
Although pool-and-weir fishways are widely used worldwide, the hydraulic factors governing the upstream passage of juvenile anguillid eels remain poorly understood. To clarify the upstream passage characteristics of juvenile Japanese eels (Anguilla japonica), we conducted laboratory experiments using a pool-and-weir fishway model with prototype-scale streamwise and vertical dimensions at the overflow section. Six experimental cases varied the head difference (Δh = 5–15 cm) and overflow water depth. Passage success decreased with increasing Δh; no successful attempts were observed at Δh = 15 cm, whereas success was 74%–86% at Δh = 5 cm. Most failures occurred near the crest inflection points, where 10 s mean velocities reached 113–167 cm/s and pronounced local changes in velocity and flow direction were observed. These findings suggest that, for the 45° inclined crest tested, Δh should be maintained below 15 cm to enable the upstream passage of juvenile Japanese eels. This threshold should not be directly applied to other crest geometries, which require further investigation. When anguillid passage is a management target, fishway designs should minimize high-velocity zones, maintain a continuous low-velocity route near the weir surface, and reduce abrupt transitions in velocity and flow direction.
No takes yet. Share an insight, caveat, or question.
Yataya et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: