Key result
Multidisciplinary QI initiative increases discharge orders before noon to 32% on pediatric service.
Why the study?
Does a multidisciplinary quality improvement intervention increase the percentage of discharge orders placed before noon in a pediatric hospital medicine service?
Does a multidisciplinary quality improvement intervention increase the percentage of discharge orders placed before noon in a pediatric hospital medicine service?
Absolute Event Rate: 32% vs 27%
A multidisciplinary quality improvement initiative successfully increased the rate of discharge orders placed before noon from 27% to 32% without negatively impacting length of stay or readmission rates.
May support similar QI huddles in pediatric services; hypothesis-generating for throughput gains and broader adoption.
Introduction: Delays in patient discharges lead to inefficient hospital throughput and reduced access to care. The aim of this quality improvement (QI) project was to increase the percentage of discharge orders placed before noon (DOBN) by the pediatric hospital medicine (PHM) service from 27% to 32% between January 1, 2021, and December 31, 2022. Methods: We convened a multidisciplinary team of hospitalists, residents, nurses, and bed management staff and surveyed key stakeholders to identify the most important barriers. Key interventions included the implementation of a multidisciplinary huddle, earlier preparation of the electronic health record for discharges, and prioritizing rounding on discharge-ready patients. The outcome measure was the monthly percentage of DOBN. Balancing measures were 7-day readmission rates and average length of stay (LOS). The primary measure was analyzed using a statistical process control chart (p-chart), and the balancing measures were analyzed using run charts. Results: The baseline rate of DOBN on the PHM service was 27%. After interventions, this increased to 32%. The LOS was 2.5 days, and the average 7-day readmission rate was 2.4%. Run chart analysis showed no special cause variation in the balancing measures. These results were sustained for 16 months without increasing LOS or 7-day readmission rates. Conclusions: The QI team successfully increased the DOBN rate for a PHM service by applying QI methods and adopting a multidisciplinary approach to discharge planning and preparation.
No takes yet. Share an insight, caveat, or question.
Willis et al. (2026) studied Hospitalized pediatric patients. Multidisciplinary discharge planning and workflow redesign vs. Baseline standard care was evaluated on Percentage of discharge orders placed before noon (DOBN). A multidisciplinary quality improvement initiative including huddles and early electronic health record preparation increased the rate of discharge orders placed before noon from 27% to 32% on a pediatric hospital medicine service.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: