Answers are grounded in this paper and cite their sources.
Line stopping creates a temporary isolation barrier inside a pressurised pipeline while the system remains in service. A stop that seats is not yet an isolation: safe reliance depends on verified bore condition, equipment and fitting capacity, differential-pressure loading, bypass requirements, defined proving criteria, monitoring, and a controlled route through equalisation, retraction and completion. This technical decision paper (FRALEX-TDP-004) sets out the evidence required before a line stop is accepted as an isolation barrier and distinguishes single-barrier arrangements from configurations providing independently verifiable isolation. It addresses proving against predefined acceptance criteria for leakage and pressure build-up and the continuing monitoring required while personnel rely on the isolation. The paper presents the FRALEX Decision Gate across seven fixed dimensions with five defined outcomes and distinguishes contractor method responsibility, engineering assessment and operator decision authority. It is product-neutral and intended for plant operators, asset-integrity engineers, line-stopping contractors and HSE stakeholders. It is the condensed public form of the FRALEX Global Leak Sealing Standard (GLSS).
No takes yet. Share an insight, caveat, or question.
Frank Havemann (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: