Answers are grounded in this paper and cite their sources.
Photovoltaic (PV) systems are widely adopted to achieve zero-energy performance in buildings, but the temporal mismatch between PV generation and electricity demand limits operational self-sufficiency. Retrofitting existing PV-equipped buildings with battery energy storage systems (BESSs) can increase on-site PV utilization, reduce grid dependence, and manage peak demand. However, measured-data-based evidence on the capacity-dependent performance of PV–BESS retrofits remains limited. This study proposes a hierarchical energy management strategy for a PV–BESS retrofit in an existing zero-energy building (ZEB). The strategy coordinates PV self-consumption, BESS charging and discharging, and peak shaving under state-of-charge (SOC) and power conversion system (PCS) constraints. Five BESS capacities (100–500 kWh) were evaluated using a measured-data-driven simulation based on one year of 15-min PV generation and building load data. A 300 kWh BESS (1.10 kWh/kWp) increased the annual self-sufficiency rate (SSR) from 65.6% to 88.5% and the self-consumption rate (SCR) from 38.4% to 52.5%, while reducing maximum grid-import demand from approximately 128 kW to the 100 kW control target (about 22%). Performance gains diminished markedly as capacity increased beyond 300 kWh because of constraints imposed by PV surplus, load profiles, SOC limits, PCS capacity, and the peak-control target. Accordingly, 300–400 kWh (1.10–1.47 kWh/kWp) was identified as an operationally favorable capacity range for the investigated building. The proposed strategy provides a practical basis for BESS retrofit sizing and coordinated energy management in existing PV-equipped ZEBs.
No takes yet. Share an insight, caveat, or question.
Song et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: