Answers are grounded in this paper and cite their sources.
With the increasing influence of climate change, green development has become an important trend. Since manufacturing represents approximately one-half of total energy consumption, reducing the amount of energy consumed within this industry is imperative. This study provides a hybrid flow shop scheduling issue under a time-of-use and ladder electricity price system to reduce total energy consumption without compromising maximum completion time. An improved non-dominated sorting genetic algorithm II with some optimization strategies is proposed to solve the problem. First, an enhanced constructive heuristic algorithm is used to improve the quantity of initial solution in the initialization. Besides, an adaptive genetic operation is introduced, aiming to avoid the emergence of locally optimal solutions. In addition, the right-shift approach is developed to reduce the total energy consumption without affecting completion time. By maintaining the production efficiency and reducing the energy consumption cost by 4.33%. A trade-off proposal is made between productivity and sustainability in view of the calculation results.
No takes yet. Share an insight, caveat, or question.
Chen et al. (2022) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: