As renewable energy penetration increases, the lack of flexibility in a multi-renewable power system can seriously affect its own economics and reliability. To address this issue, three objectives are considered in this study: power fluctuations on tie-line, operating cost, and curtailment rate of renewable energy. Presented also is an optimal day-ahead scheduling model based on the MREPS for distributed generations with flexibility constraints. The multi-objective particle swarm optimization (MOPSO) algorithm can be applied to obtain a set of Pareto non-dominated solutions for the day-ahead scheduling strategy with the proposed model. By using fuzzy comprehensive evaluation, the optimal compromise solution is determined in the set. The presented method sacrifices a small amount of economy and power fluctuation, but it can reduce the deviation between forecast and realized power fluctuations on the tie-line, while improving the utilization of renewable energy.
No takes yet. Share an insight, caveat, or question.
Yang et al. (2022) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: