This is the authors' abstract. We don't add key points for this paper.
Performance of the electric power system has emerged as a foremost policy concern in the United States. Accelerated occurrence of fossil-fuel-fired capacity retirements, the growing penetration of intermittent energy resources and natural gas-fired generation, rapid load growth, and severe weather events have amplified vulnerabilities associated with certain critical dimensions of the electric power system that conventional system modeling and planning frameworks were not designed to holistically review or address. The primary energy supply (PES) is one such dimension. Conventional analytical and planning frameworks that are centered on the bulk power system (BPS) and related adequacy metrics commonly treat the PES as a stable, exogenous modeling input, an assumption proven consequential during the fuel-supply-disruption-derived blackouts of Winter Storms Uri in 2021 (impacting the Texas ERCOT footprint) and Elliott in 2022, which affected the Eastern Interconnection and produced first-of-a-kind rolling blackouts in Kentucky, among other places. Means, methods, and metrics for evaluating PES performance are largely absent from the conventional planning toolset. Utilizing the structure and content of Kentucky's Energy Planning and Inventory Commission (EPIC) mandate as an analytical lens (selected because of its comprehensive nature) this review characterizes this PES analytical gap. In this piece, we explore the analytical capabilities that comprehensive regional energy planning requires in light of contemporary power system pressures – capabilities that conventional planning methods cannot presently supply – and we outline the methodological development needed to fill the PES analytical gap.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
Hart et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: