Answers are grounded in this paper and cite their sources.
We consider the parallel-batch scheduling with release dates and rejection on identical parallel machines, in which, each job is either accepted and processed on one of the m machines or rejected by paying a rejection penalty. The objective is to minimise the makespan of the accepted jobs plus the total rejection penalty of the rejected jobs. This problem is strongly NP-hard. We first present an approximation algorithm with a constant performance ratio 4. Furthermore, we design and analyse a (3+1m−1mb)-approximation algorithm, where m and b are the number of machines and the capacity of each batch. Then we propose pseudo-polynomial-time dynamic programming algorithms and polynomial-time approximation schemes for the case with identical release dates and the case with k distinct release dates, respectively.
No takes yet. Share an insight, caveat, or question.
Wu et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: