Computational study demonstrates improved batch scheduling in additive manufacturing using Hopfield neural networks, suggesting scalable optimization for industrial 3D printing.
In this study, we investigate a parallel additive manufacturing batch scheduling problem with unrelated parallel machines operating under powder bed fusion technology. The objective is to minimize the makespan and the total weighted earliness and tardiness. We propose a constructive heuristic that accounts for problem-specific characteristics such as due dates, earliness/tardiness penalties, and machine batch availability. To further enhance solution quality, we develop a Hopfield neural network (HNN)-based improvement scheme specifically tailored to this problem. The performance of the proposed approach is evaluated against an integrated mixed integer linear programming formulation, as well as a Genetic Algorithm (GA). Computational experiments based on adapted benchmark instances demonstrate that the HNN-based solution approach outperforms the solver and the GA on larger instances with limited machines, while it remains competitive with the GA for smaller instances.
No takes yet. Share an insight, caveat, or question.
Zipfel et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: