This is the authors' abstract. We don't add key points for this paper.
The three-stage modular solid-state transformer (SST) is a typical SST with a non-trivial start-up process. Specifically, special controls must be used to reduce the inrush current in the DC/DC stage during the start-up process of these SSTs. For the DC/DC stage based on the widely studied single-phase-shift dual active bridge (DAB), no inner-phase-shift control is required in its normal operations. In this case, using the existing inner-phase-shift control to reduce the inrush current increases the PWM channel requirements of microprocessors and the complexity of the control system. To address this problem, this paper proposes a long-dead-time control with easy implementation to reduce the inrush current without introducing additional PWM channel requirements. Fixed-dead-time and varied-dead-time controls are also proposed to reduce the inrush current when restarting three-stage modular SSTs with small cell capacitors without increasing the PWM channel requirements. The varied-dead-time control is faster than the fixed-dead-time one. The magnitude of the DAB current under these controls is calculated, and the overall time for fulfilling the proposed controls is estimated. The simulation and experiment on a 510 V/380 V 500 kW cascaded-full-bridge SST reveal that the proposed controls can effectively reduce the inrush currents during the start-up and restart processes of SSTs.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
Zhang et al. (2019) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: