Answers are grounded in this paper and cite their sources.
Tunisia, located along the diffuse Africa–Eurasia plate boundary in North Africa, is characterized by moderate but persistent seismic activity associated with distributed crustal deformation in the central Mediterranean region. Despite several probabilistic seismic hazard assessments (PSHA) conducted over the past decades, deterministic scenario-based approaches remain limited, particularly for the evaluation of safety-critical infrastructure. This study presents the first national-scale deterministic seismic hazard assessment (DSHA) for Tunisia. The analysis integrates an updated seismotectonic framework, a harmonized earthquake catalogue, and the definition of 13 seismogenic source zones, combined with representative focal mechanisms and maximum credible earthquake (MCE) scenarios. Deterministic ground-motion estimates were computed using the OpenQuake platform and two regionally calibrated ground-motion prediction equations, incorporating first-order site effects through Vs30 proxy models. The results reveal strong spatial variability in seismic hazard, with peak ground acceleration (PGA) values reaching ∼0.42 g in structurally active regions, including the Southern Tunisian Atlas, the Gulf of Gabès margin, the Gulf of Hammamet, and northeastern Tunisia. These values exceed previously reported PSHA estimates (0.22–0.36 g for a 475-year return period), highlighting the conservative nature of deterministic scenario-based approaches. Site-specific analyses show a marked contrast between the Marsa Douiba site, characterized by high seismic demand (PGA ≈ 0.34 g; peak spectral acceleration ≈ 0.8 g), and the Skhira site, which exhibits significantly lower ground-motion levels (PGA ≈ 0.15 g). These findings demonstrate the critical role of DSHA in capturing physically plausible worst-case seismic scenarios and emphasize the necessity of integrating deterministic and probabilistic approaches for robust seismic hazard assessment, particularly in the context of nuclear safety and critical infrastructure planning.
No takes yet. Share an insight, caveat, or question.
Naji et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: