Answers are grounded in this paper and cite their sources.
In the process of fracturing stimulation of carbon storage reservoirs and intermittent carbon dioxide injection, the cyclic loading and unloading acting on casing serves as the primary inducement for the formation of microannuli at the casing-cement sheath interface, which further leads to wellbore gas channeling. Targeting this problem, this paper proposes an innovative prevention and control scheme by optimizing the outer wall structure of casing and adopting interlocking sealing between casing and alloy layer. On this basis, a numerical model of casing-alloy layer-cement sheath-formation under interlocking conditions is established, and the interlocking length and interlocking pressure between the casing and alloy layer under cyclic loading and unloading are calculated; meanwhile, a sealing performance coefficient is introduced as a quantitative index to systematically analyze the influence laws of serration angle, serration height and serration number per unit length on sealing performance, optimize the geometric parameters of serrations, and determine the optimal deployment scheme of the sealing device at different formation depths. The research results show that under identical mechanical conditions, the sealing performance coefficient is significantly improved with the increase of serration angle and serration height, accompanied by a simultaneous enhancement of sealing integrity; as the number of serrations per unit length increases, the sealing performance coefficient presents a variation trend of first decreasing and then rising. In addition, severe damage is prone to occur on alloy serrations when the device is deployed in shallow or deep formations, which is unfavorable to its field popularization and application, while the sealing device can achieve the optimal application benefit when the formation temperature ranges from 60 to 100 °C. The research findings can provide an important theoretical reference for wellbore integrity protection and wellbore gas channeling prevention and control under cyclic loading and unloading conditions.
No takes yet. Share an insight, caveat, or question.
Xi et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: